Physical security risk management

The new standard in physical security

  • Digitised risk assessments
  • Real-time insights
  • Defensible decisions

AIR replaces notebooks, spreadsheets and static reports with one system of record — digitising security methodology without replacing the expertise behind it.

The AIR risk matrix: threats across the top, assets down the side, and a colour-rated cell for every pair.
Built for

One platform for every expert

  • Building owners & operators

    Ensure the security and operational continuity of physical assets through real-time threat analysis and proactive risk management.

  • Corporate security teams

    Streamline risk assessments, enhance decision-making and optimise resource allocation to safeguard operations globally.

  • Government agencies

    Navigate volatile and dynamic environments with advanced security insights tailored for public safety and national security.

  • Global brands & organisations

    Protect intellectual property, physical locations and brand reputation with actionable, structured risk insights.

Global security challenges

Physical security is still managed through non-scalable workflows

  1. Manual site notes and fragmented evidence

  2. Inconsistent scoring across assessors and regions

  3. Static reports outdated on issue

  4. Limited traceability during audit or incident investigation

AIR modules

AIR becomes your central system of record for physical security risk

Asset Criticality Manager

Rate every asset before you assess it

AIR defines and rates your site assets based on building type and location, mapping each one to every aspect of your security operations.

  • Structured asset baselines
  • Editable criticality ratings
  • Cross-site asset visibility
  • Mapped to threats, vulnerabilities and risks
The AIR asset register for a site: asset groups with their criticality ratings and a criticality breakdown chart.
Digital Survey Tool

Replace notebooks, spreadsheets and post-site consolidation

A guided workflow captures every observation on site, in one structured pass.

  • Guided workflow on mobile and tablet
  • Photo, note and voice capture
  • Floor plan markup and tagging
  • Structured question sets
The AIR survey tool on site: a floor plan beside a concern with its overview, affected assets and media files.
Security Risk Assessment

Consistent SRAs, kept live and up to date

Structured threat scoring, vulnerability mapping and risk analysis — generated the same way every time, and refreshed daily rather than filed away.

  1. Automated threat identification

  2. Vulnerability analysis

  3. Risk analysis

  4. Risk treatment strategy

Get in touch